CJ68,CJ69
Refurbishment and Upgrade of 20 Tonne Gantry Ship Unloader
CJ67
30 Tonne E.O.H.T. Billet Crane
CJ60
40 Tonne Intermodal Transtainer® Crane
CJ57,CJ61
40/80 Tonne Single Lift Portainer® Crane
CJ59
40/80 Tonne Panamax Container Crane
CJ58
40/60 Ton Single Lift Portainer® Crane
Project Nos: CJ68 and CJ69

UPGRADE AND REFURBISHMENT OF 2 ONLY
20 Tonne CAPACITY GRAB-TYPE SHIP UNLOADERS

 Project Description:

Client: Pasminco Australia Limited
Locations of Installations: Pasminco Hobart Smelter (CJ68)
Pasminco Port Pirie Smelter (CJ69)
Installation Date of Original Cranes:

1982 (DPE Project No CJ47)

Handover Date of Refurbished and Upgraded Cranes:

May 1997 (CJ68)
August 1997 (CJ69)

 Specifications (After Upgrade):

 Dimensions:

Overall Dimensions:
76 metres long x 37 metres high x 22 metres wide
Mass:
680 Tonnes
Outreach from Waterside Rail:
23.5 metres
Backreach from Landside Rail:
14.5 metres
Rail Span:
16.0 metres
Height of Lift above Waterside Rail:
19.0 metres
Depth of Lower below Waterside Rail:
9.3 metres

 Duties:

Hoist  
Safe Working Load (including grab):
29.0 Tonnes
Grab Capacity (3 supplied):
8.0 m3 / 14.0 m3 / 15.0 m3
Hoist Speed:
90.0 metres/minute loaded
120.0 metres/minute unloaded
Design Throughput :
1000 Tonnes/hour
 
Other Operations:
Traverse Speed:
142.0 metres/minute
Gantry Travel Speed:
36.0 metres/minute
Time to Raise/Lower Boom:
4.3 minutes

 Scope of Refurbishment and Upgrade Work:

  • Manufacture and Installation of New Hoist Machinery including Gearbox Rotating Elements and Rope Drums
  • Complete Overhaul of Travel Drive Machinery including Bogies, Wheels, Axles and Replacement of Open Gearing
  • Overhaul of Boom Hoist Gearbox including Manufacture and Installation of New Rotating Elements
  • Overhaul of Traverse Drive Gearboxes
  • Manufacture and Install of New Dump Hopper, Belt Feeder and Associated Support Structure and Accesses
  • Installation of New Drives and PLC Cubicles and Rewiring of Cranes
  • Increase of Crane Outreach by 1.0 metres
  • Increase of Crane Safe Working Load from 20 Tonnes to 29 Tonnes
  • Increase of Crane throughput from 600 Tonnes / hour to 1000 Tonnes / hour
     



[ Company Profile | Facilities | Crane Installations | Oil Exploration Equipment | Quality Assurance | Contact Deer Park Eng ]

DEER PARK ENGINEERING PTY. LTD. - OVER SIXTY YEARS OF ENGINEERING EXCELLENCE

Australia's leading name in precision heavy engineering


© Copyright 2007, DEER PARK ENGINEERING PTY. LTD.